Agile interview questions for data teams

12 questions from beginner to advanced, each with the correct answer and a one-line explanation of why. Study them here, or take them as a timed test.

12 questionsBeginner 6 · Intermediate 6Answers + explanations
Take it as a timed test
Free PDF
All 389 questions & answers, in one file

DAX, Excel, Power BI, Fabric, certification practice and analyst interviews — every answer with the reason behind it. Print it, study it offline.

Instant download, plus the free Tuesday briefing. Unsubscribe in one click.

Beginner 6 questions

1A Scrum sprint is…

  1. A team role
  2. A design document
  3. A daily meeting
  4. The backlog
  5. A fixed-length iteration delivering an increment
Show answerHide answer

E · A fixed-length iteration delivering an increment A sprint is a time-boxed iteration (often 1–2 weeks) producing a working increment.

2The daily stand-up is for…

  1. Solving every problem in depth
  2. Long design discussions
  3. A quick sync on progress, plan and blockers
  4. Demoing to clients
  5. A formal status report to the boss
Show answerHide answer

C · A quick sync on progress, plan and blockers It's a short coordination check, not a deep problem-solving session.

3The product backlog is…

  1. A team calendar
  2. The sprint report
  3. A prioritized list of work and requirements
  4. A list of bugs only
  5. The finished product
Show answerHide answer

C · A prioritized list of work and requirements It's the ordered, evolving list of everything the product might need.

4A retrospective focuses on…

  1. Demoing features
  2. The product roadmap only
  3. Blaming individuals
  4. Assigning next tasks
  5. How the team can improve its process
Show answerHide answer

E · How the team can improve its process Retros inspect and adapt the team's way of working.

5An MVP (Minimum Viable Product) is…

  1. The best team member
  2. The smallest version that delivers value and validates learning
  3. The complete final product
  4. A requirements document
  5. A throwaway prototype
Show answerHide answer

B · The smallest version that delivers value and validates learning An MVP tests key assumptions with the least build needed.

6Kanban primarily emphasizes…

  1. Fixed sprints
  2. Detailed upfront specs
  3. Visualizing work and limiting work-in-progress
  4. Assigning story points
  5. Daily deadlines
Show answerHide answer

C · Visualizing work and limiting work-in-progress Kanban focuses on flow: visualize the work and cap WIP.

Intermediate 6 questions

7Who owns and prioritizes the product backlog in Scrum?

  1. The Product Owner
  2. The line manager
  3. The Scrum Master
  4. The developers
  5. Any stakeholder
Show answerHide answer

A · The Product Owner The Product Owner is accountable for the backlog and its ordering.

8The Scrum Master's core role is to…

  1. Facilitate the process and remove impediments
  2. Manage salaries
  3. Write most of the code
  4. Assign tasks to developers
  5. Own the backlog
Show answerHide answer

A · Facilitate the process and remove impediments The Scrum Master serves the team by enabling the process, not managing people.

9A user story is best framed as…

  1. As a [user], I want [goal], so that [benefit]
  2. A bug report
  3. A technical spec
  4. A Gantt chart
  5. A test case
Show answerHide answer

A · As a [user], I want [goal], so that [benefit] This format keeps the focus on user value and the why.

10A 'Definition of Done' exists to…

  1. Assign story points
  2. Estimate effort
  3. Track velocity
  4. Set a shared, consistent quality bar for completed work
  5. Replace testing
Show answerHide answer

D · Set a shared, consistent quality bar for completed work It ensures everyone agrees when work is truly complete.

11Team velocity is used to…

  1. Set rigid deadlines
  2. Bill clients
  3. Measure typing speed
  4. Rank individuals
  5. Forecast how much work a team can take on, based on past sprints
Show answerHide answer

E · Forecast how much work a team can take on, based on past sprints Velocity is a planning aid for the team, not a performance score for people.

12Limiting work-in-progress (WIP) tends to…

  1. Remove the need for reviews
  2. Slow everything down
  3. Increase multitasking
  4. Guarantee more features
  5. Improve flow and reduce costly context-switching
Show answerHide answer

E · Improve flow and reduce costly context-switching Less WIP means work finishes faster and switching costs drop.